Kohler 1237791-2-J Guide D'installation Et D'entretien page 9

Baignoire autoportante à jets d'air
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Alignment Guides
5. Install the Bath
NOTICE: Do not lift the bath by the piping or blower, or use the piping or blower for structural support
of the bath. To avoid damage to the bath, lift by the rim at the sides of the bath.
NOTE: To provide access for securing the connections, temporarily position block spacers on opposing
ends between the shroud and the bath rim. Position the blocks to avoid damaging the alignment guides
located under the bath rim. The type of alignment guides may vary by product.
With help, carefully lift the bath into place over the shroud and onto the temporary blocks.
For Wireless Music Kit: Refer to the instructions included with the music kit for wiring and
installation details, and make the final electrical connections.
Secure all drain connections and fittings according to the drain instructions.
For a rim-mount faucet, install the faucet and trim according to the faucet and trim instructions.
Make sure there is adequate support under the bath rim to support the faucet. Refer to the "Prepare
the Rim-Mount Faucet (Optional)" section.
For USA and Mexico: Plug the blower power cord into the electrical outlet installed inside the
shroud.
Carefully remove the blocks and make sure the bath rim engages the top of the shroud on all sides.
Ensure all alignment guides are inside the shroud; there should be no gap between the bath and the
shroud.
Install the drain flange and overflow cover according to the drain instructions.
Close the bath drain. Fill the bath to the overflow, and check for leaks.
If desired, apply a thin, continuous bead of clear or color-matched 100% silicone sealant to the seam
between the shroud and the finished floor.
Test Run the Bath
Check all electrical connections and make sure that the electrical power to the bath is on.
Fill the bath to a level at least 4" (102 mm) above the top of the highest airjet.
Operate the bath for 5 minutes and test the airjets.
For additional information on bath operation, see the "Operating Instructions" section.
Kohler Co.
9
Temporary
Blocks
1237791-2-J

Publicité

Table des Matières
loading

Table des Matières