Bosch Start Line TCE 420 Notice Originale page 33

Machine à monter les pneus
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50
3. Lift the mounting arm onto the TCE 420 as shown
in the figure below.
4. Put the air pipe that inside column into the machine
body.
5. Position the TCE 420, then drive the fixed axis
insert into the corresponding holes with a hammer
and fasten.
Robert Bosch GmbH
Unpacking | Start Line TCE 420 | 33
6. Connect the fixed axis insert to the bead breaker
cylinder and mounting column, and then fasten.
7. Before lifting the complete TCE 420.
8. Affix the cover then fasten the screw.
en
|
1 695 108 074
2016-07-27

Publicité

Table des Matières
loading

Table des Matières