Zodiac TRiPRO Notice De Montage page 31

Masquer les pouces Voir aussi pour TRiPRO:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Fit the other end of the pipe to the one-way valve located onto the POD.
POD overview with all its equipment :
pH sensor
Flow switch
Water flow
 Installing the intake pipe (container  peristaltic pump) :
1. Cut an adequate length of hose from the supplied coil (part #7) to connect the pH minus container to
the TRi PRO peristaltic pump.
2. Fit the tube onto the threaded input connector on the pump as illustrated in the picture below. The
suction inlet for the peristaltic pump is marked with an arrow pointing up on the translucent blue casing.
3. Drill a hole of appropriate size to accommodate the suction pipe in cap of the pH minus container and
also another smaller hole to prevent the container from distorting ("air inlet").
4. Pull the free extremity of the pipe through the hole drilled in the cap, then place the ceramic weight as
well as the nozzle (see picture below, parts #6 & #11).
5. Ensure that ALL connections are safe and watertight before operating the TRi PRO module.
6. Put the protection cover of the TRi PRO module peristaltic pump back into place.
pH minus
injection
ACL sensor
31

Publicité

Chapitres

Table des Matières
loading

Table des Matières