Coffee Making Tips & Preparation - Breville the Dual Boiler BES920XL Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PAge heAder.....
oPERAtInG yoUR BREvILLE PRodUCt
Next, repeat the process on the left
c)
screw. As the valve is opened, water may
begin flowing into the drip tray.
Allow valves to remain open until no
d)
more water or steam escapes.
Close both valves by rotating screws
e)
clock-wise until seated. Do not
overtighten screws to avoid damaging
the valves. Replace the grey silicone
cover over the valves.
Empty drip tray and reinsert into
f)
position. Use caution as the drip tray
may be hot due to the water and steam
from the boilers.
26
CoffEE MAkInG tIPS
& PREPARAtIon

Publicité

Chapitres

Table des Matières
loading

Table des Matières