Mounting The Monitor - Dometic WAECO PerfectView M7LS Instructions De Montage Et De Service

Masquer les pouces Voir aussi pour WAECO PerfectView M7LS:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39
_M7LS.book Seite 31 Freitag, 14. Oktober 2011 5:32 17
PerfectView M7LS
6.2
Using branch connectors (fig. 6, page 5)
To prevent loose connections in the branch connectors, it is important to ensure that the
cable cross sections fit into the branch connectors.
To use the branch connectors, proceed as follows:
➤ Insert the cable to be tapped in the front groove of the cable connector (A).
➤ Insert the end of the new cable up to approx. 3/4 of the way into the rear groove (B).
➤ Use a pair of combination pliers to close the connector by pressing the metal pin in.
This creates an electrical connection (C).
➤ Press down the safety cap until it snaps into place.
➤ Check that the connection is secure by lightly tugging the cable (D).
6.3
Creating clean soldering joints
Proceed as follows to solder a cable to the original cables (fig. 7, page 5):
➤ Strip approx. 10 mm of insulation from the end of the original cable (A).
➤ Strip approx. 15 mm of insulation from the end of the cable to be connected (B).
➤ Wind the cable to be connected around the original cable and solder the two cables
together (C).
➤ Insulate the two cables with insulating tape (D).
Proceed as follows to solder two cables together (fig. 8, page 5):
➤ Strip the two cables (A).
➤ Place a shrink sleeve with a length of approx. 20 mm over the cable (B).
➤ Twist the cables together and solder them (C).
➤ Place a shrink sleeve over the soldered point and heat it briefly (D).
7

Mounting the monitor

7.1
Tools required (fig. 1, page 3)
For installation and assembly you will need the following tools:
Measuring ruler (4)
Centre punch (5)
Hammer (6)
Drill bit set (7)
Drill (8)
Screwdriver (9)
EN
Mounting the monitor
31

Publicité

Table des Matières
loading

Table des Matières