Changing The Battery; Network Installation - QUNDiS RNN5 Notice D'utilisation

Masquer les pouces Voir aussi pour RNN5:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

en - Operating and Installation Instructions Q node 5
Start of service life calculation with a new battery:
node display reads
. The operator then has to press the blue
the new main battery.
Caution: It is possible to disconnect the main battery from the net-
work node during operation and then to insert the connector again.
would result in the wrong remaining capacity display.

Changing the battery:

is inserted. The operator then has to wait until
der to start the service life calculation for the new main battery.
The backup battery must not be disconnected at this point
since this would result in a loss of data.
Depassivation:
of the battery can occur. It is then no longer able to supply the net-
several minutes. The network node then starts up in idle mode. If
The M-Bus can be connected temporarily or permanently (installed
cluded in the scope of supply.
M-Bus
Sealing
be secured using the seal provided. The seal is inserted into the seal
opening on the right-hand side of the network node.
Completing installation of the network
display for standard mode
set to standard mode.
Correct disposal of this product
Products delivered in Germany and directly from Germany
All appliances must be brought to a controlled recycling
electrical and electronic devices from QUNDIS must not be dis-
posed of via public collection points for electrical devices. All old
electronic devices from QUNDIS must be sent to us for disposal.
QUNDIS ensures correct disassembly and recycling of the devices. Costs for disposal are borne by QUNDIS.
In countries of the European Community excepting Germany
Information concerning correct waste disposal is available from your dealer or from the responsible sales and distribution channels.
20
is dis-
M-Bus connection for gateway
and service
FUM5-00AM-DES-N5550

Network installation

-
The red MODE key is pressed on a network node Q node 5.5. The key
changes the network node to installation mode (can be recognised
by
installation mode added later into one wireless network.
-
-
-
Three network nodes before in-
stallation:
Display level A alternates be-
addresses and network numbers
(according to the state on deliv-
-
-
Before network installation:
Display level B shows one net-
work node each
Installation of the metering devices:
The metering devices are set to installation mode.
Before network installation:
Display level C shows no meter-
ing devices in the network.
The stamped delivery is to be sent to the following address:
Three network nodes after / dur-
ing network installation:
Display level A permanently
shows wireless primary ad-
dresses and an identical network
number.
After / during network installa-
tion:
Display level B shows the num-
ber of network nodes in the net-
work.
After / during network installation:
Display level C shows the num-
ber of metering devices in the
network.
V1.0 / 31.01.2019

Publicité

Table des Matières
loading

Table des Matières