Commissioning, Operation; Mechanical Mounting - WIKA O-10 Mode D'emploi

Masquer les pouces Voir aussi pour O-10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Commissioning, operation

6. Commissioning, operation
CAUTION!
Prior to commissioning, the pressure sensor must be subjected to a visual inspection.
EN
Leaking fluid is indicative of damage.
Only use the pressure sensor if it is in perfect condition with respect to safety.
CAUTION!
The model O-10 (T) pressure sensor must not be exposed to any condensation.

6.1 Mechanical mounting

Required tool: Open-ended spanner (spanner width 24)
The sealing faces at the instrument have to be undamaged and clean.
When screwing the instrument in, the force required to do this must not be
applied through the casing, but only through the spanner flats provided for
this purpose and using a suitable tool.
When screwing in, do not cross the threads.
For information on tapped holes and welding sockets, see Technical
information IN 00.14 at www.wika.com.
22
WIKA operating instructions pressure sensor, model O-10
Spanner flats

Publicité

Table des Matières
loading

Table des Matières