INSTALLATION
3

INSTALLING THE OPERATOR

4
6
Position the operator
54
Installation Manual
Assembly positions and levels
38 mm
205 mm
5
7
1
Gate
2
Belt
3
Pulley
4
Operator
5
Guide profile
6
Base for the operator
7
Electrical cable ducts
The base of the operator must be
suitable for the strain involved.
During the construction of the base, install
ducts for the electrical cables.
1 Position the operator on the base (1). Do not attach
just yet.
2 Place a pencil (2) in the supports (3) so that it
touches the leaf of the gate.
3 Move the gate from end to end in order for the
pencil to make a mark [M] on it. This mark will be
used to position the guide profile.