Commencing Operation; Instructions For Electrical Connection; Cable, Extensions And Plugs - Bona Edge UX Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46

Commencing Operation

Instructions for electrical connection

This machine only operates
with the voltage and frequency
shown on the machine data
plate. Before connecting the
cable to the power supply
ensure the correct voltage and
frequency are available.
Cables, extensions and plugs
Only use approved cables. The maximum
recommended cable length is 10 m; for greater
lengths use cables with a larger cross-section.
MACHINE WITH 230 V~50 Hz MOTOR 1.25 kW
For machines with a 230 V~50 Hz motor, a HO5VV-F-3x2,.5
mm2 HAR-approved power supply cable must be used along
with an approved SCHUKO 2P+E 16 A 200÷250 V plug.
DO NOT expose the machine to rain. This machine is
intended for dry use only. Keep the machine in a dry
building and DO NOT use it in damp or wet places.
If the machine is not connected correctly to the electricity
network, death due to electrocution may occur. To
prevent electric shocks always use a grounded three
wire electrical system. For maximum protection against
electric shocks use a circuit protected with a differential
cut-out switch.
Tampering with the grounding plug in any way may result
in death from electrocution. DO NOT cut, remove or
break the grounding plug. If the socket does not match
the plug consult a qualified electrician.
Using the machine with unsuitable and/or excessively long
cables may cause injury or damage to people or objects.
The machine must never be moved using its cable and the
cable must never be pulled when disconnecting from the
socket.
Keep the cable away from sources of heat, oil and sharp
edges.
Bona Edge UX
If the machine is used with
a damaged plug or power
supply cable, death may
occur from electrocution.
If cables or plugs are worn
or damaged in any way,
have them replaced by the
manufacturer or certified
machine repair center in order
to prevent risks to safety.
9
EN

Publicité

Table des Matières
loading

Table des Matières