Startup And Operation Of The Twistorr 305-Ic - Agilent Technologies TwisTorr 305-IC Mode D'emploi

Table des Matières

Publicité

Startup and Operation of the TwisTorr 305-IC

To turn on the TwisTorr 305-IC via the on board controllers, supply the pump
with the proper supply voltage and then act on the "START"and "INTERLOCK"
signals. Once these signals are recognized the controller will start the pump.
(1) In order to find the location of the supply voltage input pins (on the IN/OUT
NOTES
and Power Supply Connector), as well as the input voltage admitted values,
please refer to "Technical Specifications" section and to "IN/OUT and Power
Supply" section of this instruction manual.
(2) In order to find the location of the START/STOP and INTERLOCK input pins
(on the IN/OUT and Power Supply Connector), as well as the related
electrical ratings, please refer to the "IN/OUT and Power Supply" section of
this instruction manual.
(3) In order to find details about how to connect the START/STOP and the
INTERLOCK signals, please refer to the "How to Connect the Open Collector
Inputs of the Controller" section of this instruction manual.
(4) The TwisTorr 305-IC is provided with a DB15 mating connector, not pre-wired.
This DB15 mating connector is suitable to withstand to the current level
needed to supply the controller and it is fully compatible with the DB15
connector which is mounted on the control unit. It can be used, after properly
wiring, both to connect the TwisTorr 305-IC to the supply source as well as to
the accessory parts (cooling fan, vent valves) and also to the serial comm.
TwisTorr 305-IC User Manual / 87-901-058-01

Startup and Operation of the TwisTorr 305-IC

Instructions for Use
217/302
7

Publicité

Table des Matières
loading

Table des Matières