When Installing The Control Pad - Epson Europe EB-1420Wi Guide D'installation

Masquer les pouces Voir aussi pour Europe EB-1420Wi:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Guide
Aspect ratio for standard projected image

When installing the Control Pad

When installing the Control Pad, make sure there is enough space in the surrounding area as shown in the
following figure. Because the top cover opens from the left-hand side, you need space on the left-hand side
of the Control Pad.
[Unit: mm]
When supplying power using batteries, install the Control Pad within the shaded range shown in the following
figure.
19

Publicité

Table des Matières
loading

Table des Matières