Shipment; Packing; Packing Contents - TE Connectivity AT-SC MK II Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1-528050-0
5

Shipment

5.1

Packing

Upon receipt, unpack the pneumatic Parallel Crimp Machine
AT-SC MK II carefully and check that you have received all
components against the packing slip, declaration of conformity
and operating instruction. We recommend that you retain the
packing for further dispatch and for storage.
Dimension:
Length:
Width:
Height:
Weight wooden box:
Gross-Weight:
(Wooden box/machine)
DANGER!
 The use of a chain hoist or lifting device is recommended for transporting the
crimping machine.
5.2

Packing Contents

1 pc
Pneumatic Parallel Crimp Machine AT-SC MK II
with counter and operating instruction
(without die set)
1 pc
Pneumatic double foot pedal with cover
1 pc
Hexagon Allen Key 2,5 mm
1 pc
Grease gun
1 pc
PU air hose Ø 8/6 mm at 1 meter
1 pc
PU fourfold special air hose Ø 6/4 mm at 2 meters
1 pc
T-handle
1 pc
power supply 12 V with changeable adapter for EU/US/UK/AU
560 mm (22,1'')
350 mm (13,4")
610 mm (24")
11 kg (24 lbs)
37 kg (82lbs)
Page 43 / 94
412-94233 REV. D1
Fig. 5.01

Publicité

Table des Matières
loading

Table des Matières