Normal Operation - SATA vision 2000 Mode D'emploi

Masquer les pouces Voir aussi pour vision 2000:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 199
Operating Instructions SATA vision 2000
EN
the eyebrows. To do this, lengthen or shorten the perforated band run-
ning over the head via the latching mechanism until the right position is
reached.
8.3. Check seating position of the breathing protection hood
Notice!
The hood inlay must surround the whole face contour, and the field of
vision in the carrier frame must not be restricted (beards, etc.). If this is
not the case, a correction must be made at the head band.
■ Put on the breathing protection hood with the carrier frame open.
■ Check the adjustments of the head band and correct, if necessary (see
chapter 8.2).
■ Close the carrier frame.
8.4. Cleaning the breathing protection hood
Notice!
Before using for the first time, the breathing protection hood must be
cleaned thoroughly with SATA wet and dry Cleaner (# 75358).

9. Normal Operation

Before any use, check the following points to ensure safe work with the
breathing protection hood.
■ Adhere to all safety and hazard warnings in this operating manual.
■ Air supply working pressure (see chapter 7).
■ Head/breast cloth undamaged, clean and properly attached.
■ View through the carrier frame unhindered.
■ Breathing protection hood is properly seated.
■ Only use intact SATA safety compressed air tubes.
■ Carrier frame fixture fully functional.
9.1. Fitting the belt unit
The belt unit can be adjusted individually at the length-adjustable belt.
■ Adjust length / circumference of the belt unit accordingly.
■ Put on the belt unit.
■ Close the belt unit at the clasp.
9.2. Put on the belt, rgeulator and respirator hood
■ Put on the breathing protection hood with the carrier frame open.
■ Check the adjustments of the head band and correct, if necessary (see
142

Publicité

Table des Matières
loading

Table des Matières