Operation; Connecting The Power Cable; Unit Installation; General Informations - VOLTCRAFT HPS-11530 Mode D'emploi

Bloc d'alimentation de laboratoire programmable
Masquer les pouces Voir aussi pour HPS-11530:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8. Operation

The laboratory power unit is not a charger. To charge batteries, use suitable chargers with a charging cur-
rent cut-off.
During a longer period of operation under nominal load, the surface of the housing will heat up. Attention!
Risk of burns! Therefore, make sure that there is adequate ventilation of the power unit and never operate
it partly or fully covered to avoid any damage.
When connecting a consumer, ensure that it is not connected when switched on. A switched-on consumer
can result in sparks when connecting to the output terminals of the power unit, which in turn can damage
the sockets or the connected cables and/or their clamps.
If your power unit is not required, switch it off and disconnect it from the mains. The displays remain on for
a few seconds after it is switched off to unload the internal capacitators and to store the last parameters
that were set.
Always ensure a sufficient conductor cross-section for the DC connection lines, since overload may cause
fire in the line.
a) Connecting the power cable
1. Connect the supplied grounding mains cable to the low-power device installation socket (18) on the power unit.
Ensure a tight fit.
2. Connect the power cable to a shockproof mains socket with protective grounding. The maximum length of the
power cable to the outlet must not exceed 3 m.
b) Unit Installation
Place the laboratory power unit on a stable, level and robust surface. Make sure that ventilation slots in the casing
are not covered up.
c) General Informations
The laboratory power unit is micro-processor-controlled and is operated through two digital controls (incremental
encoders without end position) with sensor function. This enables fine and coarse control via a control.
After the device switches on, a system check is performed. The test status is displayed on the two displays.
The displays are in the following order:
Display of the current software state.
33

Publicité

Table des Matières
loading

Table des Matières