Layout And Items Supplied; Technical Data; Proper Use; Before Starting The Machine - EINHELL TC-CH 1000 Instructions D'origine

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15

2. Layout and items supplied

2.1 Layout (Fig. 1/2)
1. Load chain
2. Hand chain
3. Fastening hook
4. Load hook
5. Chain pulley
6. Drive wheel
7. Latch lock
2.2 Items supplied
Open the packaging and take out the equip-
ment with care.
Remove the packaging material and any
packaging and/or transportation braces (if
available).
Check to see if all items are supplied.
Inspect the equipment and accessories for
transport damage.
If possible, please keep the packaging until
the end of the guarantee period.
Danger!
The equipment and packaging material are
not toys. Do not let children play with plastic
bags, foils or small parts. There is a danger of
swallowing or suff ocating!
Original operating instructions

3. Proper use

Der Kettenfl aschenzug ist eine Vorrichtung zum
senkrechten Heben und Absenken von Lasten.
The equipment is to be used only for its prescri-
bed purpose. Any other use is deemed to be a
case of misuse. The user / operator and not the
manufacturer will be liable for any damage or inju-
ries of any kind caused as a result of this.
Please note that our equipment has not been de-
signed for use in commercial, trade or industrial
applications. Our warranty will be voided if the
machine is used in commercial, trade or industrial
businesses or for equivalent purposes.
Anl_TC_CH_1000_SPK9.indb 11
Anl_TC_CH_1000_SPK9.indb 11
GB

4. Technical data

Max. holding diameter Fastening hook: .... 22 mm
Max. holding diameter of the load hook: ... 22 mm
Nominal hoisting capacity ........................1000 kg
Max. stroke height: ..................................... 2.5 m
Size of load hoisting chain ..................................
(ISO 3077-T(8)): .................................. 6 x 18 mm
Weight: .......................................................8.9 kg
Type
Load capaci-
ty (kg)
TC-CH 1000
1000

5. Before starting the machine

1. Before you lift a load with the chain hoist, you
should make yourself familiar with the "wit-
hout load" function of the chain hoist.
2. Make sure the chain hoist is securely fas-
tened. Be careful when choosing fastening
points. These points must be able to carry
double the load. If you are unsure as to whe-
ther the chosen point is the right one, please
choose a diff erent one.
3. The chain hoist should be fastened so that it
cannot change its position during operation.
4. The latch locks which are attached to the fas-
tening hook and the load hook must always
be closed during operation
6. Operation
6.1 Lifting the load
On the front side of the chain block there is an
engraved arrow pointing upwards, labelled "UP".
Pull the hand chain (2) on this side of the chain
block in order to lift the load.
6.2 Lowering the load
On the front side of the chain block there is an
engraved arrow pointing downwards, labelled
"DN".
Pull the hand chain (2) on this side of the chain
block in order to lower the load.
Caution!
The brake can become hot when loads are lowe-
red. In this case, lower the load slowly and with
suffi cient breaks.
- 11 -
Chain band
1
29.06.2017 14:28:42
29.06.2017 14:28:42

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

22.501.10

Table des Matières