Before Operation - EINHELL BT-HD 14,4 Li Mode D'emploi D'origine

Masquer les pouces Voir aussi pour BT-HD 14,4 Li:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Anleitung_BT_HD_14_4_Li_SPK1:_
Hammer drilling concrete
Vibration emission value ah a
= 4,189 m/s²
h
K uncertainty = 1.5 m/s
2
Caution:
The vibration value changes according to the area of
application of the electric appliance and may exceed
the specified value in exceptional circumstances.
Keep the noise emissions and vibrations to a
minimum.
Only use appliances which are in perfect working
order.
Service and clean the appliance regularly.
Adapt your working style to suit the appliance.
Do not overburden the appliance.
Have the appliance serviced whenever
necessary.
Switch the appliance off when it is not in use.
Wear protective gloves.

5. Before operation

Be sure to read the following information before you
use your cordless hammer drill for the first time:
1. Charge the battery pack with the charger
supplied. An empty battery pack requires a
charging period of approximately 3 hours.
2. Only sufficiently sharpened drills and drill bits,
which are in perfect working order, should be
used.
3. When screwing into walls or partitions, test these
for electrical, gas or water mains.
6. Operation
6.1 Charging the LI battery pack (Fig. 2-3)
The battery is protected from exhaustive discharge.
An integrated protective circuit automatically switches
off the appliance when the battery is flat. In this case
the bit chuck will cease to turn.
Warning! Do not press the ON/OFF switch any more
if the protective circuit has actuated. This may
damage the battery.
1. Remove the battery pack (8) from the handle,
pressing the pushlock buttons (10) downwards to
do so.
26.06.2009
7:19 Uhr
Seite 11
2. Check that your mains voltage is the same as that
marked on the rating plate of the battery charger.
Plug the battery charger in the plug socket and
connect the charging cable to the charging
connection. The charging process starts as soon
as the charging cable is connected to the
charging adapter.
3. If the green LED (a) flashes, the battery is being
charged.
4. After successful charging, the LED light is green
(a)
If the battery pack fails to charge, please check
whether there is voltage at the socket-outlet.
for proper contact with the charging contacts in
the battery charger.
If the battery pack still fails to charge, send
the battery charger
and the battery pack
to our customer services department.
To ensure that the LI battery pack provides long
service you should take care to recharge it promptly.
You must recharge the battery pack when you notice
that the power of the cordless hammer drill drops.
6.2 Tool insertion (Fig. 4)
Caution: Set the changeover switch on the appliance
(6) to its centre position whenever you carry out any
work (for example changing the tool, maintenance
work, etc.)
Clean the tool before insertion and apply a thin
coating of drill bit grease to the shaft of the tool.
Insert the dust-free tool into the tool mounting as
far as it will go whilst turning it. The tool will lock
itself.
Check that it is properly secure by attempting to
pull on the tool.
6.3 Tool removal (Fig. 5)
Pull back and hold the locking sleeve (2) and remove
the tool.
6.4 Insert drill bit (Fig. 6/Item 12)
Caution: Set the changeover switch on the appliance
(6) to its centre position whenever you carry out any
work (for example changing the tool, maintenance
work, etc.)
Pull back and hold the locking sleeve (a).
Insert the drill bit (b) into the bit chuck (c), let go of
the locking sleeve (a).
Check that it is properly secure by pulling the tool.
GB
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

45.134.70

Table des Matières