Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WiNDOW REQUiREMENTS

1
• T hese instructions are for a standard
double-hung window. You will need to modify
them for other types of windows.
• T he air conditioner can be installed without
the accordion panels if needed to fit in a
narrow window. See the window opening
dimensions.
• A ll supporting parts must be secured
to firm wood, masonry or metal.
• T he electrical outlet must be within reach of
the power cord.
• F ollow the dimensions in the table and
illustration for your model.
23" to 38"
(With accordion panels)
STORM WiNDOW REQUiREMENTS
2
A storm window frame will not allow the air
conditioner to tilt toward the outside, and will keep it
from draining properly .
To adjust for this, attach a piece of wood to the sill .
WOOD PiECES
WiDTH: 2"
LENgTH: Long enough to fit inside the window
frame .
THiCKNESS: To determine the thickness, place a
piece of wood on the sill to make it 1/2" higher than
the top of the storm window frame or the vinyl
frame .
Attach securely with nails or screws provided by the
installer .
1/2" higher
than storm
window
frame
Storm window
frame
installation instructions
12.5" min .
1/2" higher
than vinyl frame
(on some windows)
Wood
Sill
Vinyl frame
ATTACH THE TOP MOUNTiNg
3
RAiL SEAL STRiPS
(Some models may have the seal strip already
attached to the top mounting rail . If applicable, skip
this step . )
Remove the backing from the top mounting rail seal
strip and attach the seal strip to the bottom of the
top mounting rail, along the front edge .
FRONT ViEW
PREPARE THE AiR CONDiTiONER
4
Install the top mounting rail with 4 Type A
A
screws from the outside of the case.
Top mounting rail
Bottom mounting rail
Hold the accordion panel in one hand and
B
gently pull back to free the open end.
8
Top mounting rail
Remove
backing
from seal
strip
Top mounting rail
Seal strip

Publicité

Chapitres

Table des Matières
loading

Table des Matières