CHIEF LPK1 Instructions D'installation page 6

Kit de montage peu encombrant pour projecteur
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

LPK1
4.
Align four mounting holes in LPK1 with four pilot holes. (See
Figure 4)
IMPORTANT ! : Make sure mount is properly oriented
towards target before securing to structure.
5.
Secure LPK1 to structure using four 5/16" flat washers and
four 5/16" x 2-1/2" hex head lag bolts (not included). (See
Figure 4)
5
Figure 4
Solid Concrete Installation
1.
Determine mounting location.
WARNING:
The LPK1 is designed to be mounted to a
concrete ceiling with a minimum thickness of 8" and a
maximum drywall covering of 5/8".
WARNING:
IMPROPER INSTALLATION CAN RESULT IN
SERIOUS PERSONAL INJURY OR DAMAGE TO
EQUIPMENT! Structural members MUST be capable of
supporting five times the combined weight of all equipment
being mounted.
2.
Using the LPK1 as a guide, mark four mounting hole
locations on ceiling. (See Figure 5)
3.
Drill four 5/16" diameter x 3-1/4" long pilot holes. (See
Figure 5)
4.
Align four mounting holes in LPK1 with four pilot holes.
6
x 4
x 4
2
Figure 5
IMPORTANT ! : Make sure mount is properly oriented
towards target before securing to structure.
WARNING:
Anchors (not provided) must be installed into
structurally sound solid concrete. Installation into hollow
concrete block, mortar, or concrete that exhibits cracking,
spalling, or other defects may result in failure of anchor and
serious personal injury or damage to equipment.
5.
Install four Fischer UX8 or Toggler AF8 concrete anchors
(not included) by inserting into pilot holes and pounding in
until flush with mounting surface. (See Figure 6)
6.
Secure LPK1 with attached VCM (not included) to structure
using four 5/16" flat washers (not included) and four
5/16" x 2-1/2" lag bolts (not included). (See Figure 6)
6
Figure 6
Installation Instructions
3
x 4
x (4)
5
x 4
x 4

Publicité

Table des Matières
loading

Table des Matières