Askoll Energy Saving 15-60/130 Instructions D'installation Et Fonctionnement page 18

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 35
explanation of the coding
Example
Model
Hydraulic housing
in COMPOSITE
Hydraulic housing
in BRONZE
Hydraulic housing
with AIR VENT
Rated diameter (DN) of the
suction and output openings
Max head
Center-to center
distance size
Flanged circulator
Twin circulator
Circulator equipped with
power cable
Circulator with Molex
connector
2.4 Supply
Complete circulator.
Two flat seals in EPDM.
Instructions for assembly, use and maintenance.
2.5 accessories
Accessories needed have to be ordered separately.
- Tube for the connection to the hosing.
3. inStallation anD Start
3.1 installation
installation and service by qualified personnel only!
The circulator must be mounted in a stable/fixed position in a dry, well ventilated,
frost-free, waterproof and protected place, with sufficient ventilation around it.
Assemble the circulator only after having ended all welding and brazing works on
the hosing. Before installing the circulator, make sure that the internal part of the
tubes is clean.
Install the circulator in an accessible place for future checks and disassembly
procedures. Foresee enough space for inspections and disassembling.
16
energy Saving (C) (B) (A) 25
-60
/180 (F)
(D) (W) (M)

Publicité

Table des Matières
loading

Table des Matières