Installation Site - SECOH ATB-80 Instructions De Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Instruction Manual ATB-80, ATB-100, ATB-120
3.3 Installation
The installation of the pump should take place through our service
personnel or a recognised specialist. Incorrect installation can lead
to damage.

3.3.1 Installation site

Install the pump only at sites which are secure against rain and
snow! Infiltrating rain and snow can lead to faults and malfunctions.
Fundamentally, the pump must be installed above the water
table concerned. Installation below the water table, with the
switching off of the pump, leads to a siphon-like return flow of
the water, which leads to malfunctions.
The pump may not be installed in the immediate surroundings
of containers with flammable gases. Not only the pump can be
destroyed or materially impaired through possible explosions.
.
The pump should fundamentally be mounted at shady and well-
ventilated sites.
Heat radiation damages the diaphragms and valves.
Do not install the pump at locations which have high dust
concentrations.
The air filter is severely affected by excessive dust.
Through this a high power consumption results, which leads to
heavy build-up of heat in the pump.
This, in turn, damages the diaphragms and valves.
As far as possible the pump should be installed in a position which enables the
unhindered access of maintenance personnel.
ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com
Art.-Nr.: 9060 0306 / Version: 17.08.2020 / Page 24 de 48
ENGLISH

Publicité

Table des Matières
loading

Produits Connexes pour SECOH ATB-80

Ce manuel est également adapté pour:

Atb-100Atb-120

Table des Matières