General Installation - Electrolux EIED200QS Instructions D'installation

Masquer les pouces Voir aussi pour EIED200QS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

General installation

1 Use a carpenter's level to level your dryer front-to-back
and side-to-side.
2 Use adjustable pliers to adjust the leveling legs so the
dryer is level front-to-rear and side-to-side, and stable
corner-to-corner.
3 Press down on alternate corners and sides and feel for
the slightest movement. Adjust the appropriate leg(s)
so the dryer sits solidly on the floor on ALL four legs.
Keep the leveling leg extension at a minimum for best
performance of the dryer.
IMPORTANT
Be sure the power is off at a circuit breaker/fuse box before
plugging the power cord into an outlet.
4 Plug the power cord into a grounded outlet.
5 Turn on the power at the circuit breaker/fuse box.
6 Read the Use & Care Guide provided with the dryer. It
contains valuable and helpful information that will save
you time and money.
7 If you have any questions during initial operation,
please review the "Avoid Service Checklist" in your Use
& Care Guide before calling for service.
8 Place these instructions in a location near the dryer for
future reference.
NOTE
A wiring diagram is located next to the water container
behind the left cabinet panel.
Installation Instructions
11

Publicité

Table des Matières
loading

Table des Matières