Install Ductwork; Measure The Installation - Venmar C180 Série Directives D'installation, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. INSTALL DUCTWORK

Plan where and how the ductwork will be installed.
Install proper-sized ductwork, elbow(s) and roof or wall cap for the type of blower you are installing.
If using 6" round ducts, use a transition. Use 2" metal foil duct tape to seal duct joints.
Roof cap
Wall cap
HH0011A

2. MEASURE THE INSTALLATION

Dimensions for the most common installations are shown below.
We recommend to install the hood at a minimum distance of 20" from an electric range and
at 24" from a gas range.
For optimal performance, the hood should not be installed more than 30" from cooktop.
Cabinets
Hood
HH0013A
3¼" x 10" duct
Hood
20" minimum
clearance
(24" for gas)
Standard
36" height
cooktop
Wall cap
HH0014A
Cabinets
Hood
HH0012A
- 4 -
Roof cap
6" round duct
3¼" x 10" to 6"
round transition
Hood
30" maximum
clearance
Standard
36" height
cooktop

Publicité

Table des Matières
loading

Table des Matières