Scope Of Delivery; Tools Required - Loewe Screen Lift Plus Instructions D'installation

Table des Matières

Publicité

1
A
B
2
N
M
6 6
C
X
(2x)
L
W
Y
I
H
K
J
E
F1
D
R
Q
T
P
O

1 Scope of Delivery

A Tubular section
B Tubular section cover
F2
C 2x2 screws for tubular section flange
D Ceiling bearing
E
Floor bearing with stop pin
F1 Support arm pre-assembled
F2 Adapter plate
G Pre-assembled support arm lock
H Lower tubular section flange
I
Upper tubular section flange
J
Sleeve with threaded pin for floor bearing
K Sleeve with threaded pin for ceiling bearing
L
Nut and bolt for upper tubular section flange
W Bolt for lower tubular section flange
X 2 support arm covers
Y Bolt for fastening the adapter plate to the support arm
Z
Plastic cable straps
Check that the contents are complete.

2 Tools Required

M Power drill with bit suitable for the ceiling and floor.
G
Z
N Spirit level
O
Allen keys from 3 to 6 mm, Torx wrench size T20
P
Pencil for marking
Q Tape measure
R Sawing aid
S
Hack saw
T
Phillips screwdriver
U Hammer
S
V File for removing burr from sawn edges
You also need
-
A tape measured for measuring the height of the room exactly to
1 mm
-
Plumb line
V
-
6 countersunk screws suitable for the ceiling and floor (see also
figures 9 and 14)
U
-
If necessary, plugs for ceiling and wall fastening to fit the screws

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

65486 série

Table des Matières