Télécharger Imprimer la page

Beko QWIK-PURE 25 Instructions De Montage Et De Service page 16

Séparateur huile-eau

Publicité

Putting into operation • Puesta en marcha
Mise en service • Colocação em funcionamento
Utilisation • Operação
16
Installation • Installation
Installation • Installatie
Operation • Servicio
4. QWIK-PURE 50 with heating (op-
tional)
• Please follow the instructions for
installation and operation of heating
Systems.
• The electrical installation must only be
carried out by suitably qualified and
authorised personnel !
- If the temperature of the medium drops
below approx. 41 °F, the heating will be
switched on automatically.
- When the setpoint temperature of 59
°F is attained, the heating will again be
switched off automatically.
- built-in overheating protection limits the
temperature of the heating system to a
maximum of 167 °F.
Fill QWIK-PURE with clean water
• Take off the cap, remove filter mat from
the pressure relief chamber
• Let in the water through the inlet open-
ing: container and filter chamber are
filling up.
• Shut off the water when it starts to come
water
out at the water outlet.
agua
eau
The water level will sink due to the
água
gradual water intake of the filter.
• Fill up with clean water as required.
• Install again filter mat and presuure
relief chamber
The QWIK-PURE is ready for operation:
• Compressor condensate can now flow
into the QWIK-PURE via the pressure
relief chamber.
Note:
Open the outlet of the condensate
drain!
Check all connections for leaks!
To ensure trouble-free operation, ob-
serve all the points listed under Main-
tenance:
The constituents of the compressor
condensate will depend on the specific
application.
It is part of the operator's duty of care to
take the necessary precautions, where
appropriate.
deutsch
english
english
QWIK-PURE 25, 50

Publicité

loading

Ce manuel est également adapté pour:

Qwik-pure 50Kt10 130 00Kt11 030 00