Preliminary Operations - Victoria Arduino EAGLE ONE PRIMA Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1B
4.4
PRELIMINA RY
O PERATI ONS
MACHINE ON/OFF
Press
the
ON/OFF
switch
found on the bottom right of
the device.
FITTING
TANK VERSION
The machine is delivered in
tank mode. Please perform
the following initial operations:
1
Open the hatch and re-
move the tank;
Wash the tank with soap
2
and water and then fill it
with water;
3
Make sure the outside of
the tank is dry and rein-
sert it correctly.
FITTING
THE
DIRECT
TACHMENT VERSION
In the case of direct attach-
ment, in addition to water
main connection, the fol-
lowing software procedure
must be performed to switch
from tank version to direct
attachment.
1A
1C
STAND-BY
Press and hold button 1B for 5
seconds to activate the ma-
chine from standby mode.
SWITCHING FROM TANK
TO DIRECT ATTACHMENT
Perform the following steps
to set direct attachment:
1
Turn off the machine us-
ing the main switch;
Press and hold the 1A and
2
1C buttons while turning
the machine on using the
ON/OFF switch. The tank
icon will blink 3 times and
then go out (signaling
that the change has been
completed successfully).
SWITCHING FROM DIRECT
ATTACHMENT TO TANK
Perform the following steps
to set tank operation:
1
Turn off the machine us-
ing the main switch;
AT-
Press and hold the 1A and
2
1C buttons while turning
the machine on using the
ON/OFF switch. The tank
icon will blink 3 times and
then remain steady for
a few seconds (indicat-
ing that the change has
been
completed
cessfully).
E AG L E O N E P R I M A | L I B R E T TO I ST R UZ I O N I - U S E R H A N D B O O K - M A N U E L D 'I N ST R U CTI O N S | 47
1A
1C
FILLING OF THE
COFFEE BOILER
The machine will go into the
following mode:
• Display showing 'FI'.
• Fast flashing of the key-
board keys.
This means the machine is
ready to run the one time
procedure to refill the coffee
boiler.
• Wait until the keyboard
LEDs start flashing more
slowly.
• To activate the refill boiler
procedure press and hold
the key 1A and 1C togeth-
er until procedure is en-
gaged (the pump starts to
run).
suc-
At the end of installation, the
device is switched ON and
taken to rated operating
conditions, leaving it in a
state in which it is "ready for
operation".
After reaching the "ready
for
operation"
condition,
the
following
dispensing
operations are carried out:
• 100% of the coffee circuit
through
the
coffee
dispenser;
• Open the steam outlet for 1
minute;
• Complete emptying of the
steam boiler. Repeat this
operation at least 3 times.
At the end of installation, it is
good practice to draw up a
report of the operations.

Publicité

Table des Matières
loading

Table des Matières