Used Symbols; User Manual - Velleman EVM892 Notice D'emploi

Multimètre numérique multifonctions
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
1.
Introduction
To all residents of the European Union
Important environmental information about this product
This symbol on the device or the package indicates that disposal of the
device after its lifecycle could harm the environment. Do not dispose of
the unit (or batteries) as unsorted municipal waste; it should be taken to
a specialized company for recycling. This device should be returned to
your distributor or to a local recycling service. Respect the local
environmental rules.
If in doubt, contact your local waste disposal authorities.
Thank you for choosing Velleman! Please read the manual thoroughly before
bringing this device into service. If the device was damaged in transit, don't install
or use it and contact your dealer.
The DVM892 is a 600V CAT II digital multi-meter with a 3½ digit LCD. This device
is can be used to measure direct and alternating voltages, direct and alternating
currents, resistance, continuity, capacity, temperature, frequency, diode and
transistors (hFE).
Be very careful when using this device: carelessness can lead to serious or even
fatal injury. Besides the usual safety-precautions for working with electrical circuits
you must follow the safety guidelines as described in this manual. Do not use this
device if you do not have preliminary knowledge of circuits and test procedures.
This device is not suitable for commercial or industrial use.
Refer to the Velleman® Service and Quality Warranty on the last pages of this
manual.
2.

Used symbols

This symbol indicates: Read instructions
Not reading the instructions and manual can lead to damage, injury or
death.
This symbol indicates: Danger
A hazardous condition or action that may result in injury or death
This symbol indicates: Risk of danger/damage
Risk of a hazardous condition or action that may result in damage, injury
or death
This symbol indicates: Attention; important information
Ignoring this information can lead to hazardous situations.
alternating: A
direct: A
Double insulation (class II-protection)
Earth
Fuse
Resettable fuse
Diode
29.04.2010
EVM892

User manual

= alternating current (AC); V
= direct current(DC); V
=DC voltages
3
= AC voltages
©Velleman nv

Publicité

Table des Matières
loading

Table des Matières