Initial Operation

NOTE!
During shipment, condensation moisture can
accumulate in the stove's interior, which may
possibly lead to the appearance of condensa-
tion or water on the stove or fl uepipes. Please
dry off these damp areas immediately.
The surface of your stove was treated in a sandblasting ma-
chine before applying the colour coating. Despite careful and
thorough inspection, there may still be some residual material
in the stove body, which can fall out when your stove is being
installed.
NOTE!
To prevent any damage, please immediately
vacuum up these small steel pellets with a
vacuum cleaner.
The fi rst time a stove is operated, the heat development causes
the emission of volatile components from the coating, sealing
strips and lubricants, and smoke and odours can occur.
At a higher combustion temperature, this one-time process can
take between 4 to 5 hours.
To achieve this higher combustion temperature, please incre-
ase the fuel quantity recommended
in Section 7, „Adding Fuel/ Heating with Nominal Thermal Out-
put", by approximately 25%.
CAUTION!
To prevent adverse effects on health, nobody
should stay in the room(s) during this process
unless absolutely necessary. Make sure the
room is well-ventilated and open the windows
and outside doors. If needed, use a fan for
faster air circulation.
If the maximum temperature is not reached during the fi rst
heating operation, you may notice an odour for a short period
of time the next time the stove is used as well.
6.

Lighting the Fire

The fi ring up phase should be as short as possible, since higher
emissions can occur during this phase.
The slider settings described in Table 1 (see fi gure on the right)
are recommendations that were determined under confor-
mance testing conditions, in compliance with the relevant stan-
dard. Depending on the weather conditions and the draught
capability of your chimney, accordingly adjust the slider posi-
tions for your Jena to the local conditions.
NOTE!
The Jena may only be operated when the fi re
box door is closed; the fi re box door may
only be opened to add fuel.
WARNING!
Never use spirits, petrol, or other fl ammable
fl uids to light the stove.
Lighting the Fire
Procedure
Position of Control
Elements
Completely open primary and
Pull primary and secondary air
secondary air.
slider all the way out. (fi g. 3)
Pull out fi re grate slider.
Open fi re grate.
Pile up any remaining ash
and unburned Charcoal into
the centre of the combustion
chamber.
Place 2-3 small logs into the
middle of the fi re box; stack
approx. 0.5 kg of dry wood
chips on top.
Light the ignition material at
several places.
Tab. 1
fi g. 3