Commissioning Test Run - Festo HSW-10 Série Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 93
HSW−...−AP/A S
Please note
S Start first of all a test run at reduced operating speed.
S Accelerate in steps until the operating speed is reached.
Pease refer to the calculations for your application for the speed required.
Interrupt the test run if:
S
there is an audible metallic knocking of the stop screws
the double rollers do not run smoothly in the path guide
the end positions are not reached
the work load falls down.
Note the instructions for troubleshooting in chapter 12.
S

Commissioning test run

1. Tighten the two upstream one−way flow
control valves:
at first completely
then loosen approximately one turn.
2. Make sure that the operating conditions
lie within the permitted ranges.
Please note
The permitted kinetic impact force at the
end stop applies for certain mass−speed
combinations. It must not be exceeded.
S Make sure that the permitted values for
the positioning time as a factor of the
work load are observed (chapter
Characteristic curves").
Festo HSW−...−AP/AS 0707a English
Fig. 27
Fig. 28
49

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hsw-12 sérieHsw-16 sérieHsw- -ap sérieHsw- -as série

Table des Matières