INSTALLATION REPORT

CONTROL OPERATION

TO BE COMPLETED BY THE FITTER
Lift model________________________
Serial number___________________________
Checking the floor
Power voltage check
Main switch
Up/down control
Correct trolley movement - operation control
End of downward movement operation control
Block tightening torque check
Telescopic arms correct sliding control
Correct arm stop engagement and release control
Screw lubrication device level control
Slide guide lubrication control
Adhesive and adhesive position check
Carrying capacity
Warnings
Serial number
Fitterís signature and stamp
Installation date