Télécharger Imprimer la page

Thermolec rve DCC-12 Manuel D'installation page 9

Publicité

STEP 7: START-UP
DCC power supply
1. Supply electrical power to the DCC.
2. Wait ten (10) seconds.
3. Check if the relay is switched on.
4. Check the pilot light:
GREEN at all time: compliant installation, go to the next step.
RED: refer to the Lights code section.
Charging station power supply
1. Put the circuit breaker in the ON position.
2. Check if the electric vehicle supply equipment (EVSE) is powered:
EVSE powered: go to the next step.
EVSE not energized: check the charging station connections.
STEP 8: SECURE AND RE-ENERGIZE
Secure
1. Turn off the power on the DCC.
2. Put the cover back.
Re-energize
1. Supply electrical power to the DCC.
STEP 9: IDENTIFICATION
1. Identify the branch circuit breaker.
2. Register all configuration settings of the charging station in the space
provided on the cover.
9

Publicité

loading