12. Access the pressure adjustment screw. Remove
the plastic cover from the valve using the special
2-pin screwdriver tip supplied in the kit. Pry the
cover off the tab on the right side using a small
screwdriver.
13. Refi t the module and log support to the appliance.
14. Fit the aeration shutter supplied with the kit and set
it as per diagram.
Natural Gas Setting
Propane Gas Setting
15. Turn on the gas supply and check for leaks using
a soap solution. The minimum and maximum gas
supply pressures are shown on page 1 and should
be verifi ed using the Supply Pressure test tap while
the unit is running at full input..
16. Fit a manometer to the manifold pressure test
tap on the valve. Light the appliance and turn the
control to full input. Check for leaks downstream of
the valve.
Manifold
Supply
pressure
pressure
test tapping
test tapping
Adjust the pressure adjustment screw while
the appliance is running at full input to produce
manifold pressure as per table on page 1.
17. Turn the appliance off . Remove the manometer
and tighten the test tapping screw. Refi t the plastic
cover to the valve.
18. Fit the data conversion label and signed conversion
label close to the rating plate. Fit the control
conversion label near the controls.
19. Re-install fuel bed and check that the appliance
operates correctly. Refer to main instructions.
Because our policy is one of constant development and
improvement, details may vary slightly from those given in this
publication.
Designed and Manufactured by / for
Miles Industries Ltd.
190 – 2255 Dollarton Highway, North Vancouver, B.C.,
CANADA V7H 3B1
Tel. 604-984-3496 Fax 604-984-0246
www.valorfi replaces.com
3