INSTALLATION & OWNER'S MANUAL
Zero Clearance Kit RA24ZC
Approved for use with Valor Retrofi re Model RF24JBN/JBP Inserts ONLY
Please read this manual in conjunction with the RF24JB heater Installation Manual
General Application
The RA24ZC Zero Clearance Kit with RF24JB heaters
may be installed in new wood frame construction with
type "B" venting.
The Zero Clearance Kit is also intended for applications
where an existing gas or wood burning fi replace is
being removed in whole or in part, without disturbing
the surrounding wall fi nish.
• The zero clearance box may be roughed-in on its
own and the RF24JB heater installed later.
• The minimum cavity for installing the Zero
Clearance Kit is shown in the Framing Dimensions
diagram next page. Existing type "B" gas venting
may be utilized provided the integrity is intact.
• Existing mantel clearances must conform to the
chart.
• For visual reasons, the zero
clearance box is painted black on
the inside; it is recommended to
paint the vent liner and gas line
with high heat paint after installing.
4000876-09
©2018, Miles Industries Ltd.
Retrofi re
4" dia. collar
Gas line
access
RF24JBN/JBP
engine
Optional fret
bracket kit
when using
optional fret
Overview
Kit Content
RA24ZC Zero Clearance Kit
3" dia. flex
Bottom cover
(not required when
using optional fret)
Cast iron fret
Convective heat shield
supplied with ZC kit
Mounting brackets
supplied with ZC kit
Outer trim
Inner trim

Publicité

loading

Sommaire des Matières pour Valor Retrofire RA24ZC

  • Page 1 INSTALLATION & OWNER’S MANUAL Retrofi re Zero Clearance Kit RA24ZC Approved for use with Valor Retrofi re Model RF24JBN/JBP Inserts ONLY Please read this manual in conjunction with the RF24JB heater Installation Manual General Application The RA24ZC Zero Clearance Kit with RF24JB heaters may be installed in new wood frame construction with type “B”...
  • Page 2 Framing Dimensions Note: 29” x 33” minimum opening in combustible wall. 23” Rear width 29” Combustible floor and hearth approved 16” 4” dia. Stand-offs collar 33” 20” Front width 23-1/4” 5-1/4” to 7-1/4” Gas line access 30” 16” Mantel Clearances See trim’s instructions manual for details on mantel clearances.
  • Page 3 Prepare ZC Box 6. Paint liner and gear clamps using black high heat paint (not supplied). NOTE: The vent plate may be positioned within a 2-inch variation front to back (see dimensions on Install Insert into ZC Box previous page). Determine the best position for the If a fan is to be installed, it should be installed to the vent plate and adjust it to suit by sliding it on top of heater before the heater is inserted into the ZC box.
  • Page 4 Install Trims 2. Place the tabs at the rear edge of the heat shield into the slots. Secure the heat shield using 2 screws on Note: Outer trims may require extending or each side. Screw from within the ZC box. custom trims may be required to cover openings.
  • Page 5 Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication. Designed and Manufactured by / for Miles Industries Ltd. 190 – 2255 Dollarton Highway, North Vancouver B.C., CANADA V7H 3B1 Tel. 604-984-3496 Fax 604-984-0246 www.valorfi replaces.com...
  • Page 6: Kit À Dégagement Zéro Ra24Zc

    ® LE PREMIER FOYER À GAZ RADIANT Kit à dégagement zéro RA24ZC Certifi é pour usage avec les foyers encastrables Valor Retrofi re RF24JB seulement Veuillez utiliser ce guide avec le manuel d’installation du foyer RF24JB Application générale Écarteurs Serre-joints de 3” (2) (fournis à...
  • Page 7: Dimensions D'encastrement

    Dimensions d’encastrement Notez : Ouverture minimum du mur combustible : 29” x 33”. 23” Largeur arrière 29” Plancher et base de foyer combustibles homologués 16” Buse de Écarteurs 4” dia. 33” 20” Largeur avant 23-1/4” 5-1/4” à 7-1/4” Accès de la conduite de gaz 30”...
  • Page 8 Préparez la caisse à dégagement zéro Installez le foyer dans la caisse zéro NOTE : Vous pouvez positioner la plaque d’évent Dans le cas ou un ventilateur doit être installé, de la caisse zéro en la glissant d’avant en arrière installez-le au foyer avant d’insérer le foyer dans ou l’inverse sur une distance de 2 pouces (voir les la caisse à...
  • Page 9 2. Glissez les onglets du défl ecteur dans les fentes de 5. Complétez l’installation du lit d’alimentation, de la la moitié arrière située dans le haut de la caisse. De télécommande, etc. tel qu’indiqué dans le manuel l’intérieur de la caisse, fi xez le défl ecteur à l’aide de d’installation du foyer RF24.
  • Page 10 Pièces 3. Si vous installez un pare-étincelles RA24DS ou RA24FS, accrochez la base de feu en fonte aux supports montés au foyer. Code Description de pièce Note : Les autres modèles de devanture incluent les Plaque d’évent 4000982 supports de montage de base de feu. Écarteurs (2) fournis à...