Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Building in

EN 18
Warning!
This appliance must be earthed.
Installation, maintenance or repairs should only be carried out by
professionals who are authorized by the manufacturer, as failure to do
so will void the warranty.
The device should be disconnected from the mains prior to installation,
maintenance or repairs. The device is only disconnected from the
electric power if:
• the main switch of the electrical wiring/installation in the house is
switched off, or
• the fuse for the electrical wiring/installation in the house has been
completely removed, or
• the plug has been pulled out of the socket.
Faulty parts may only be replaced by original Pelgrim parts. Only those
parts are guaranteed by Pelgrim to meet the safety requirements.
If the connecting cable is damaged, it may only be replaced by the
manufacturer, the manufacturer's service organisation or equivalently
qualified persons, in order to avoid dangerous situations.
Preparing the hob
Fit the elbow supplied (1/2" ISO 228 (straight)) and the sealing ring onto
the appliance's gas connection. Next, via the elbow (1/2" ISO 10226-1
(conical)), connect the appliance to the gas supply using a safety hose
or a fixed connection.
Cut opening in worktop
• Saw the opening in the worktop. This should be done very
accurately (see building in dimensions on p. 21).
• If the woodtop is made of treated wood, then coat the sawn
surfaces of the top with sealing varnish, to prevent moisture
causing the top to swell.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gk575Gk595Gkt564Gkt595

Table des Matières