Operation; General - Hatco Glo-Ray Série Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour Glo-Ray Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION

General

Use the following procedure to turn on and operate the GRSS,
GRSSR, and GRSSB units.
WARNING
Read all safety messages in the IMPORTANT SAFETY
INFORMATION section before operating this equipment.
Startup
1. Clean and sanitize the stone surface using a clean, damp
cloth and a sanitizer approved for food contact surfaces.
2. Plug unit into a properly grounded electrical receptacle
of the correct voltage, size, and plug configuration. See
SPECIFICATIONS section in this manual for details.
3. Move the Power I/O (on/off) switch to the I (on) position.
BURN HAZARD: Some exterior surfaces on the unit will
get hot. Use caution when touching these areas.
4. Turn the Temperature Control to the desired temperature
setting.
• Turning the Temperature Control knob clockwise
will increase the temperature setting. Turning the
Temperature Control knob counterclockwise will
decrease the temperature setting.
5. Allow the unit 30 minutes to reach operating temperature.
CAUTION
Power I/O (on/off) Switch
Temperature Control
Standard Control Panel—GRSS Model
NOTE: Refer to the OPTIONS AND ACCESSORIES section
for installation and operation information for GRSSB
units equipped with remote mounted control panel.
If weight on shelf exceeds 50 lbs. (23 kg), a deflection up
to 5/32" (4 mm) is possible. If weight on shelf exceeds
100 lbs. (45 kg), a deflection of 1/4" (6 mm) is possible.
Shelf is not guaranteed if weight on shelf exceeds 150 lbs.
(68 kg). All weight must be distributed evenly across entire
shelf.
Shutdown
1. Move the Power I/O (on/off) switch to the O (off) position
and allow the unit to cool completely.
2. Perform the "Daily Cleaning" procedure in the
MAINTENANCE section of this manual.
10
English
NOTICE
Form No. GRSSM-1020

Publicité

Chapitres

Table des Matières
loading

Table des Matières