table of contents
EN
1.0
1.1
1.2
1.3
1.4
1.5
1.6
2.0
2.1
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
4.0
4.1
5.0
5.1
5.2
vertical installation
5.3
5.4
5.5
5.6
6.0
6.1
6.2
6.3
6.4
6.5
6.6
7.0
8.0
8.1
9.0
note:
Changes, other than editorial, are denoted by a vertical line in the margin
4
W415-3036 / 05.07.21
5
9.1
nailing tab installation
9.2
fl ush
5
9.3
6
9.4
7
9
9.5
9
10
10.0
finishing
11
10.1
10.2
10.3
13
14
10.4
18
10.5
19
19
10.6
19
10.7
20
10.8
22
10.9
24
10.10
25
10.11
11.0
26
28
11.1
11.2
29
11.3
30
12.0
31
12.1
overview
31
12.2
valve train assembly
31
13.0
32
14.0
warranty
32
33
15.0
33
34
35
36
37
37
37
37
37
38
39
40
41
42
43
43
44
45
46
46
47
47
48
49
50
51
52
53
54
54
55
55
56
56
57
57
58
59
60
61
64
65