KUDA PACKAGING
1
2
3
4
6
5
Fig. 11
SERVIS A NAHRADNÍ DÍLY
06.14
www.kuda-packaging.com
–
Remove the four screws (Fig. 11/1) and remove
the cover (Fig. 11/2) .
–
Remove the four screws (Fig. 11/3) lift of the top
cap (Fig. 11/4).
–
Lift out the top cap.
–
Remove the piston (11/6) from the cylinder (11/5).
–
Replace piston cpl. (11/6).
–
Lubricate the o-ring on the piston with grease
MS4 (Order No. 184943).
–
Install the piston cpl.
–
Install the top cap and (11/4) and the cover (11/2).
+420 607 237 237
Josef Kihlberg JK45-783
info@kuda-packaging.com
7.3 REPLACE PISTON COMPLETE
servis@josef-kihlberg.eu
9