Servicing/Repairs/Cleaning; Servicing; Replace The Bellow - Sartorius Contego Manuel D'installation

Module de pesage hygiénique load cell pr 6241 d1; module de pesage hygiénique load cell pr 6241 d1e; module de pesage hygiénique load cell pr 6241 c3; module de pesage hygiénique load cell pr 6241 c3e
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hygienic Weighing Module Contego®
8

Servicing/Repairs/Cleaning

8.1

Servicing

8.1.1

Replace the Bellow

Warning:
The vessel may turn over during mounting.
Securing the vessel against tipping is imperative.
Procedure
Remove a defective bellow (not shown) and discard it according to the local regulations.
Release and remove the bolts (7).
Fold the stopper (6) onto the bottom plate and withdraw it sideways together with the film.
Release and remove the bolts (1).
Release the locknut (4) and screw the bolt of the lift-off protector (3) at the hex (2) into the threaded
bush (5).
Release and remove the threaded bush (secured with Loctite) with the complete lift-off protector (3).
EN-26
Installation Manual
Sartorius

Publicité

Table des Matières
loading

Table des Matières