Connection; General Information; Load Cell - Sartorius Contego Manuel D'installation

Module de pesage hygiénique load cell pr 6241 d1; module de pesage hygiénique load cell pr 6241 d1e; module de pesage hygiénique load cell pr 6241 c3; module de pesage hygiénique load cell pr 6241 c3e
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hygienic Weighing Module Contego®
5

Connection

5.1

General Information

Caution:
The load cell cable end is protected against contamination and moisture by a
protective sheathing.
Remove the protective sheathing only shortly before connecting!
Protect the cable ends against contamination. No moisture must penetrate into the open cable end.
Don't shorten the load cell connecting cable. Connect the prepared cable end and roll up the remaining
cable.
The cable screen may be connected only to the connecting terminals of the indicator.
Keep the load cell cables away from power cables.
The distance between the measuring cables and the power cables or components under high voltage
should be at least 1 m (reference value).
We recommend laying the load cell cables in separate cable trays or armored steel pipes.
Power cables should be crossed at right angles.
5.2

Load Cell

Colour Code
rd = red
bu = blue
gn = green
gy = grey
EN-20
Installation Manual
+ Supply voltage
+ Meas. voltage / + Load cell output
– Supply voltage
– Meas. voltage / – Load cell output
Screen
Sartorius

Publicité

Table des Matières
loading

Table des Matières