Télécharger Imprimer la page

GE MCP2024DXBB Instructions D'installation page 6

Publicité

Les langues disponibles

Les langues disponibles

5
CLAMP THE COOKTOP (cont.)
Electric line opening
A:
12” (30.5 cm) min. from
bottom of countertop and
adjacent cabinet
(right side)
A
Install junction
can be reached
trough the front
of the cabinet
Figure 10
Installation Instructions
box so that it
Solid surface
countertop installation
Figure 11
THE CONDUIT IS 3 FEET LONG
The junction box, must be located where it will
allow considerable slack in the conduit for
serviceability.
Important:
• For solid surface material installations such as Surel™
and Corian®, consult with solid surface manufacturer.
Apply heat reflective tape such as Scotch® Aluminum Foil
Tape #425 or #427 around the cutout so that it folds over
on the top and sides.
• Do not wrap the tape underneath the cooktop. Be sure the
tape extends beyond the outermost flange of the cooktop.
All corners should be covered with tape.
6
Shows locations
of aluminum
reflective tape
Tape top and
vertical sides
of cutout

Publicité

loading