Télécharger Imprimer la page

Best K8087 Mode D'emploi page 10

Publicité

Les langues disponibles

Les langues disponibles

PREPARE THE HOOD
Note: On stainless steel hoods, carefully
remove the plastic protective film from all
exterior surfaces of the hood and
decorative flues, prior to final installation.
DUCTED CONFIGURATION
1. Remove the tape on the electrical system
plate; place the electrical system plate on
the hood (use a protection). Fig. 5
2. Install the discharge collar into the duct
connector of the range hood. Fig. 6
3. Attach an adequate length of 6" round
steel ducting to the range hood duct
connector. Fig. 6
4. Duct tape all joints to make them secure
and air tight.
5. Carefully place the lower decorative flue
into the recessed area of the range hood
top. Fig. 7
6. Carefully slide the upper decorative flue
down inside the lower flue. Fig. 7
Note: On 8" ceilings the air vents on the
upper flue are concealed by installing the
flue with air vents down.
On 9" ceilings, air vents on the upper flue
will be exposed after installation.
UPPER
FLUE
LOWER
FLUE
UPPER FLUE VENTS
EXPOSED
- 10 -
ELECTRICAL
SYSTEM
PLATE
PROTECTION
6"
DIAMETER
DUCT
DISCHARGE
COLLAR
DUCT
CONNECTOR
UPPER FLUE VENTS
UPPER
FLUE
LOWER
FLUE
FIG. 5
FIG. 6
CONCEALED
FIG. 7

Publicité

loading