Installation guide
STEP 7
Carefully flip the base over on to its legs. Important: Two people are required to
move the bed base. Do not drag across the floor. Do not rest frame on its side,
excessive pressure may damage the legs.
STEP 8
Plug the power cord into a power source. A surge protector is recommended.
STEP 9
Ensure batteries are correctly installed in the back of the remote.
Quickly test functions to verify proper setup before placing mattress on base.
Return the base to a flat position before placing the mattress on top.
8
For customer support, visit www.ergomotion.com or call: 1-888-550-3746
STEP 10
Insert the ends of the mattress retainer bar into the holes at the foot of the
platform.
Setup is now complete! Test all functions on remote.