Routine And Planned Maintenance; In General; Routine Maintenance; B - A Machine Cleaning - OEM FX Série Mode D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 57
Chapter 6

6.1 - ROUTINE AND PLANNED MAINTENANCE

6.1.a- In general
DANGER
The routine and planned maintenance works should
be performed when the machine is stopped and the
main switch is in position "
The routine maintenance works have been divided in
two types:

• ROUTINE MAINTENANCE:

It includes all the maintenance works to be made on
the machine everyday.
• PLANNED MAINTENANCE:
It includes all the maintenance works to be made
according to a maintenance plan in order to ensure a
correct working of the machine.
6.1.b - Routine maintenance
6.1.b.a - Machine cleaning
• The outer part of the machine shall be cleaned by
utilizing a water-soaked cloth.
• In case of machines equipped with head (1), lift the
latter and remove the container (2), as indicated in
the relevant chapters.
• Clean the container (2) by washing it with water and
utilizing detergents or other degreasing, non-chemical
products being suitable for food equipment.
• Clean the spiral element (3) by utilizing a water-soaked
sponge.
• Mop the machine components and in case of machines
equipped with container, mount the latter again and
lower the head.
GB - 20
" OFF.
FIG. 1
1
3
2
3
FX / RVE
Maintenance
2

Publicité

Table des Matières
loading

Table des Matières