Télécharger Imprimer la page

ECOFOREST ecoGEO HP Serie Manuel D'installation page 39

Masquer les pouces Voir aussi pour ecoGEO HP Serie:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

1.
Prepare the appropriate proportions of antifreeze mixture in external tank A.
2. Connect the external recirculation pump outlet to valve D.
3. Connect a transparent hose from valve E to antifreeze mixture tank A.
4. Close valve C and open filling valves D and E.
5. Start the external recirculation pump and keep it running until the return is completely free of air and the antifreeze
mixture is mixed perfectly.
6. Open valve C and keep the external pump connected to remove the air between valves D and E.
7. Close valve E and pressurise the circuit to target pressure. Make sure that the pressure does not exceed 3 bar (pressure
gauge) under any circumstance.
8. Close valve D.
After completing the brine circuit filling process, it is recommended to check the concentration of antifreeze mixture again using a
refractometer.
All manuals and user guides at all-guides.com
E
D
3
C
4
DO1
AO1
Figure 1.12. Filling the brine circuit.
38
Installer manual ecoGEO HP
B
A

Publicité

loading

Ce manuel est également adapté pour:

Ecogeo hpx 12-40 kwEcogeo hpx 15-70 kwEcogeo hpx 25-100 kw