Télécharger Imprimer la page

ECOFOREST ecoGEO HP Serie Manuel D'installation page 36

Masquer les pouces Voir aussi pour ecoGEO HP Serie:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

installed in the storage tank. Install the temperature probes at the points where heating / cooling production begins. Heating /
cooling production is stopped by the return temperature probe installed inside the heat pump.
T
AI20
DI1
EVU
DI2
DO1
AO1
DO12
Figure 1.9. Wiring scheme using two buffer storage tanks (HP3 models).
AI20
T
DI1
EVU
DI2
DO1
AO1
DO12
Figure 1.10. Wiring scheme using a single buffer storage tank (HP3 models).
Outlet units
These can manage as many as four different outlet temperatures. This is done by managing one direct outlet unit and three
combined outlet units. The combined outlet units have to use modulating 3-way valves with an analogue signal of 0-10Vdc. Each
outlet unit has independent terminals for heating and cooling demands. These signals are supplied with 24Vac or 24Vdc voltage.
DHW Recirculation
This is used to control activation of the DHW recirculation pump, depending on the temperature recorded in the recirculation line
and the established time schedule.
All manuals and user guides at all-guides.com
DO11
DO11
DI3
T
AI12
DO4
DO3
AI11
T
AI18
T
DO2
DO17
AO2
DI3
T
AI12
DO5
DO4
DO3
DO11
AI11
T
DO2
DO17
AO2
35
Installer manual ecoGEO HP
DI4
T
AI19
DI5
T
DI6
T
DO5
AI13
DO7
DO6
AO3
DG1
T
AI17
DO18
DO16
DO12
DI4
T
AI19
DI5
T
DI6
T
AI13
T
DO7
DO6
AO3
SG2
DG1
DO11
T
AI17
DO18
AI18
T
DO12
FBus2
DI7
DI9
DI11
DI13
T
T
T
T
T
DI8
DI10
DI12
DI14
T
T
T
T
T
AI14
AI15
AI16
T
T
T
T
DO8
DO9
DO10
AO4
AO5
AO6
SG2
SG3
SG4
SG5
FBus2
DI7
DI9
DI11
DI13
T
T
T
T
T
DI8
DI10
DI12
DI14
T
T
T
T
T
AI14
AI15
AI16
T
T
T
DO8
DO9
DO10
AO4
AO5
AO6
SG3
SG4
SG5

Publicité

loading

Ce manuel est également adapté pour:

Ecogeo hpx 12-40 kwEcogeo hpx 15-70 kwEcogeo hpx 25-100 kw