Télécharger Imprimer la page

Milwaukee M12 FUEL 2452-20 Manuel De L'utilisateur page 19

Tournevis à percussion hexagonal 6 mm (1/4"), clés à chocs de 1/4" & clés à chocs de 3/8"

Publicité

Les langues disponibles

Les langues disponibles

AS AN AID TO REASSEMBLY,
TAKE NOTICE OF WIRE ROUTING
AND POSITION IN WIRE GUIDES AND
TRAPS WHILE DISMANTLING TOOL.
BE CAREFUL AND AVOID PINCHING
WIRES BETWEEN HANDLE HALVES
WHEN ASSEMBLING.
U-Shaped Stamping (Ground Plate)
placed in center groove of gearcase
end cap
NOTE:
It is very important to make
sure that wires are tucked down
into the left handle halve to avoid
wires being pinched when
re-assembling tool.
Be sure that all elements of
the Electronics Assembly
(On-Off Switch, PCBA,
LED, Terminal Block
Connector and Stator)
are properly seated into
the left handle halve
before re-assembly.
63
62
27 34
35 36
34
28
4 wire
port
The fuel gauge assembly is a fixed component of the left
handle halve (43). Connect the five wire terminal block to
the corresponding five wire port on the PCBA.
Place POP Switch (63) into top slot of left handle halve.
Be sure that the '2' is positioned to the back of tool.
Route the four wires through the channel along the
inside wall as shown. Trap the wires in place using
two Rubber Slugs (28). Carefully place all components
of the Electronics Assembly (62) into the handle halve.
Connect the four wire terminal to the port on PCBA (34).
28
43
5 wire
port
When installing the Fwd/Rev
Shuttle, be sure to properly
capture the slide button of
the fwd/rev micro switch
on the PCBA with the
front cavity of the shuttle.
Once in the left handle halve,
be careful that no wires
interfer with the travel of the
Fwd/Rev Shuttle.
43
Fuel
Gauge
5 wire terminal block to
5 wire port on the PCBA

Publicité

loading

Ce manuel est également adapté pour:

M12 fuel 2453-20M12 fuel 2454-20