Télécharger Imprimer la page

Kohler K-110 Instructions D'installation page 6

Masquer les pouces Voir aussi pour K-110:

Publicité

Les langues disponibles

Les langues disponibles

8" (20.3 cm) Center-to-Center
1" (2.5 cm) Diameter Holes
3. Deck-Mount Supply Installation
Remove the temporary plugs from the water supply couplings.
Construct a frame for the deck with two 1" (2.5 cm) holes
measuring 8" (20.3 cm) apart from the center of each hole.
Carefully slide the plated supply pipe through the holes.
Thread the supply pipe into the supply rough-in and tighten with
a strap wrench.
Securely strap the supply pipes to the framing below the bath
deck.
Loosen the setscrew in the flange.
Carefully slide the flange down the supply pipe so it rests on the
bath deck.
Tighten the flange setscrew.
1008209-2-G
All manuals and user guides at all-guides.com
Plated
Supply
Flange
Pipe
Setscrew
6
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

K-331K-6905K-16210