Télécharger Imprimer la page

Kohler K-110 Instructions D'installation page 4

Masquer les pouces Voir aussi pour K-110:

Publicité

Les langues disponibles

Les langues disponibles

Pipe
Holder
Rod
Overflow
Elbow
Tee
Bracket
Setscrew
1. Prepare the Site
If not already installed, install or relocate the water supplies as
needed to conform to the roughing-in dimensions for your
particular installation.
Use thread sealant on all the threaded connections.
2. Freestanding Supply Installation
Remove the temporary plugs from the water supply couplings.
Replace the long rod with the short rod for Kohler models
K-710, K-711, K-712, K-726 and K-727. To determine the bath to
drain faucet measurement for your model bath refer to the
"Roughing-In" section of this manual.
Thread the tee bracket into the hole in the back of the overflow
elbow.
Insert the rod into the tee bracket and secure with the setscrew.
Install the Supply Tubes
Loosen the setscrews in the pipe holder and flange.
Carefully slide the plated supply pipe through the pipe holder
and flange.
Thread the supply pipe into the supply rough-in and tighten it
with a strap wrench.
Tighten the setscrews in the pipe holder and flange.
1008209-2-G
All manuals and user guides at all-guides.com
Tee Bracket
Pipe
Holder
Plated Supply Pipe
Flange
Setscrew
4
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

K-331K-6905K-16210