Power Supply; Set Up The Instrument - QEO ECOLINE EL 607 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
1
7
6
5

POWER SUPPLY

Put in 3 x AA Alkaline batteries into the battery case (take care to polarity)
and close battery compartment.
When the ON/OFF LED flashes the batteries must be replaced.

SET UP THE INSTRUMENT

1. On a tripod: Connect the laser to the 5/8" retaining bolt of a builder's
tripod.
2: On the floor: Set up the laser on the floor tripod.
Set up the instrument as upright as possible by means of the ciruclar vial of
the keypad to allow the self-levelling system to function within the range.
Fine adjustment with adjustable tripod legs.
12
2
3
4
www.geo-fennel-ecoline.com
KEYPAD
1. ON/OFF horizontal laser line H
2. MANUAL LED
3. ON/OFF MANUAL function
4. ON/OFF vertical laser line V1 and V2
5. ON/OFF LED
6. ON/OFF receiver mode
7 . LED receiver mode

Publicité

Table des Matières
loading

Table des Matières