Before You Begin; Parts Included; Tools And Parts Needed; Power Requirements And Grounding - Bosch HDIP056U Instructions D'installation

Masquer les pouces Voir aussi pour HDIP056U:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

en-us Before you begin
2 Before you begin

Before you begin

Read these instructions before you begin to install your
Before you begin
appliance.
2.1 Parts included
After unpacking all the parts, check for any damage in
transit and for completeness of delivery.
¡ Anti-tip bracket
¡ 2x wood screws
¡ 2x anchorless concrete screws
¡ Terminal lugs; for use with hard-wired installations (not
required for Canadian installations)
2.2 Tools and parts needed
Prepare these tools and accessories before you start to in-
stall your appliance.
Tools
¡ Pencil
¡ Measuring tape
¡ Level
¡ T-20 star bit screwdriver
¡ Cross head screwdriver
¡ Safety gloves
¡ Safety glasses
¡ 1¼" wrench
¡ Soapy water
¡ Cloth or cardboard to protect floor
¡ Drill and 3/16" masonry drill bit for concrete screws
¡ Pipe wrench
¡ Teflon tape - gas rated
¡ Gas leak test solution
¡ Gas supply line (½" NPT minimum)
¡ Gas shut-off valve
Parts
¡ Dual Fuel models only: 40 or 50 Amp power supply cord
kit with strain relief; depending on local codes (Not nec-
essary for Canadian installations, cord is preinstalled at
factory)
¡ 2x screws and 2x anchors for anti-tip bracket
¡ Style will vary depending on mounting surface
Additional parts needed for hard-wired installations (Dual
Fuel models only)
¡ Flexible conduit
¡ Torque wrench
2.3 Power requirements and grounding
The outlet must be properly grounded in accordance with
all applicable codes.
2.4 Gas requirements
WARNING
Make sure the gas shut-off valve and all burner controls
are in the OFF position before beginning the installation.
3 Removing the packaging

Removing the packaging

Cut the box straps.
Removing the packaging
1.
8
Open the top of the carton and remove the top wood
2.
frame.
Place the unit in front of the cabinet where it is to be in-
3.
stalled. The unit should be in line with the cabinet
cutout.
Leave the unit on the packaging base until it is ready to
be lifted into the cabinet cutout.
Remove the carton by lifting it up and off the unit.
4.
Alternatively you can carefully cut along the cut line on
the back left side of the carton with a blade shorter than
3/4" (20 mm).
Remove all internal protective packaging, racks, acces-
5.
sories, and instruction manuals from the oven cavity.
4 Installation requirements

Installation requirements

Read these instructions to prepare the installation space
Installation requirements
for your appliance.
4.1 Appliance dimensions
Dual Fuel slide-in ranges

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hdip056cHgi8056ucHgip056ucHdi8056uHdi8056c

Table des Matières