Télécharger Imprimer la page

Christopeit Sport 1709 Notice De Montage Et D'utilisation page 17

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24
Assembly Instructions
Remove all the separate parts from the packaging, lay them
on the floor and check roughly that all are there on the base of
the assembly steps. Please note that a number of parts have
been connected directly to the main frame and preassembled.
In addition, there are several other individual parts that have
been attached to separate units. This will make it easier and
quicker for you to assemble the equipment.
Assembly time: 35 - 45 min.
Step 1:
Attach the stabilizer (3+4) at main frame (1).
1. Attach the front foot (3) with the preassembled end caps (11)
to the main frame (1). Do this with the two screws M10x60 (12),
curved washers 10//20 (13), spring washers for M10 (67) and
cap nuts M10 (14).
2. Attach the rear foot (4) with height adjustable foot caps (15) to
the main frame (1). Do this with the two screws M10x60 (12),
curved washers 10//20 (13), spring washers for M10 (67) and
cap nuts M10 (14). After assembly has been completed, you
can compensate for minor irregularities in the floor by turning
the eccentric cap (15). The equipment should be set up that the
equipment does not move of its own accord during a training
session.
Step 2:
Attach the support (2) at the main frame (1).
1. Place screws M8x16 (16), curved washers 8//20 (56) and spring
washers for M8 (52) accessibly beside the front part of the main
frame (1).
2. Place the lower end of the support (2) against the holder of main
frame (1). Plug the ends of the two computer cables (20) and
(18) projecting from (1) and support (2) together.
(Note: The computer cable harness (18) projecting from the
support (2) must not slide into the tube, as it is required for later
steps of installation.)
3. Connect the tension cable of resistance control (17) to the
bracket of lower section cable of tension (19) (See figure A1-A3).
Before this step of the installation, it is advisable to adjust the
resistance setting to the position, at which the cable extends
furthest from the sheath. Put the lowest part of cable (17) into
the small hook of lower tension cable (19) (figure A1). Pull it until
the small hook get in higher position (figure A2) and then insert
the cable (17) onto the bracket (19) (figure A3). When joining the
tubes, ensure that the cable connection is not trapped.
4. Put one spring washer (52) and one washer (56) on each screw
(16). Push the screws (16) through the holes in the support (2),
screw into the threaded holes of the main frame (1) but don't
tighten them firmly. (This screw connection point will screw
tightly at least in Step 4)
17

Publicité

loading

Ce manuel est également adapté pour:

Ctr 2